Skip to main content

Completed

Summary
In 2010, the Nummela Gateway Wetland Park (2 ha) was built as both a water-quality mitigation landscape and an urban park. Early monitoring (2010–2011 spring floods) and a three-year ecological survey showed rapid self-establishment, rising biodiversity and multiple ecosystem services (erosion/flood control, pollutant reduction), alongside strong recreational and educational use. According to the project managers, EU LIFE+ “Urban Oases” began in 2012; from 2012–2016 the team deployed high-frequency, year-round monitoring and also sampled sub-catchments to separate urban vs. agricultural loads, which guided the construction of an additional upstream wetland (Nummelan Niittu). Peer-reviewed work documents seasonal nutrient-removal dynamics and highlights the creation of endangered clay-stream habitats. Today, municipal pages present both Portti and Niittu as accessible nature sites (trails, bird tower). The municipality also continues periodic lake-water monitoring in Enäjärvi under local programmes. Comparative studies (including Nummela) underscore how vegetation and design influence phosphorus removal performance.
Last update
2025
Summary
Reconstruction of the Lepiku channel that is a part of the drainage system, which starts from the new residential area next to the Tallinn Botanic Garden and includes wetlands, detention ponds, ditches and channels and debouches into Pirita river. The aim was to improve the quality of the storm water that flows into the Pirita river. The river Pirita is a part of Natura 2000 site and flows into the Baltic Sea. The length of the reconstructed channel part is ca 195 m and the works included: widening of channel bottom in different segments, creating artificial dykes and rapids and creating suitable conditions to the aquatic plants exhibits in Botanic Garden.
Last update
2025
Summary
This site was one of nine included in the LIFE05 project to restore priority woodland habitats in Ireland. The Durrow site lies on the floodplain of the River Erkina and had been affected by planting of non-native conifers and associated drainage. A network of shallow ditches across the site was reducing the retention time of floodwaters; to counter this, c.350 ditch-dams were installed (installation 2009, LIFE05/NAT/IRL/000182). Since then, Durrow has been confirmed as part of the River Barrow & River Nore SAC (002162), where alluvial forests (91E0*) are a qualifying interest; assessments also record calcareous “petrifying springs” (7220*) within the alluvial woodland along the Erkina floodplain, and describe Durrow as one of the largest remaining alluvial woodlands in Ireland. At catchment scale, EPA WFD characterisation shows the downstream waterbody ERKINA_050 declined from Good to Moderate status with elevated phosphate and agriculture as a significant pressure, framing ongoing risks to riparian habitats. Nationally, Coillte’s LIFE05 programme restored >550 ha of priority native woodlands across nine Natura 2000 sites (including Durrow). Locally, the Durrow Biodiversity Action Plan 2023–2028 highlights the Erkina, the Nore and associated woodlands within the SAC.
Last update
2025
Summary
Within an Austrian LIFE Nature project, gravel banks have been established along the Danube in the Wachau, and dried site-arms have been reconnected. The measures aimed at improving biodiversity through providing spawning habitats, as well as controling erosion and run-off. As a particularity, the gravel used in the project stemmed from maintenance works for the shipping channel of the Danube. The project has been initiated and implemented by a local association (Arbeitskreis Wachau), which includes several communities.

All implemented measures of "LIFE Nature Wachau" are still operational and most of them were further optimized by additional projects.

The Sidebranch reconnections of Grimsing and Rührsdorf-Rossatz are still existent and working.

Sidebranch Grimsing was expanded upstream by a new sidebrach Schallemmersdorf and significantly lengthened in 2011 - 2013 as a result of the project LIFE+ Mostviertel Wachau (lead partner: Land NÖ, implementation: viadonau). Now the sidebranch system Schallemmersdorf – Grimsing has a length of more than 4 km in total. The connection to the main stream of Donau is still working at low water level. The sidebranch system now is an important spawning area and habitat for rheopilic fish species which are typical to the Danube. The sidebranch system and the alluvial forest enclosed by it continue to serve as flood area. Further measures to expand the sidebranch system are currently planned by municipality of Emmersdorf (implementation of a new oxbow at sidebranch Grimsing).

Sidebranch Rührsdorf- Rossatz was expanded downstream by a new sidebranch Schopperstatt and significantly lengthened in 2019 – 2022 as a result of the project LIFE+ Wilderness Wachau (lead partner: viadonau, implementation: viadonau). The new sidebranch system Rührsdorf – Rossatz - Schopperstatt has a length of more than 5 km in total. The connection to the main stream of Donau is still working at low water level. The sidebranch system now is an important spawning area and habitat for rheophilic fish species which are typical to the Danube. The sidebranch system and the alluvial forest enclosed by it continue to serve as flood area.

The Revitalized oxbow Aggsbach has silted up after a few years. Municipality Schönbühel- Aggsbach therefore initiated a new project in 2013/2014 (Strukturierung Altarm Aggsbach) to further expand the oxbow lake and make it available as a spawning habitat for stagnophilous fish species. The funktion as water reservoir has been restored.

The creation of flat gravel banks and gravel islands as part of the maintenance of the Danube navigation channel has been continued since "LIFE Nature Wachau" was implemented until year 2022 (implementation: viadonau). Currently, new official permits must be obtained in order to be able to continue the work in the future.

Today, the project is still relevant and working; project was (and still is) continuously expanded through follow-up activities. The ecological goals in the Wachau could / can only be achieved through the sum of several implemented projects and ongoing maintenance activities.
Last update
2025
Summary
Life for the Burgas Lakes (LIFE08-NAT/BG/000277) was an EU LIFE+ Nature project aiming to secure the long-term conservation of five Annex I bird species and the sustainable management of their wetland habitats around Burgas, implemented in coordination with Burgas Municipality, Chernomorski Solnitsi (Black Sea Saltworks), the Bulgarian Biodiversity Foundation and RSPB (2010–2014). Since then, complementary measures across the complex have consolidated and expanded results: at Poda (Ramsar), works in 2023 reopened the Komlushki canal, rehabilitated a dyke and installed water-level control; at Lake Vaya, the outlet canal to the Black Sea was rehabilitated in 2023 to increase hydraulic capacity, rebalance salinity and improve the water regime; at Atanasovsko Lake, the Salt of Life and Lagoon of Life projects (2012–2018; 2018–2024) restored dikes, cleaned saltwater channels and enhanced lagoon habitats, with Bulgaria’s first successful Greater Flamingo breeding recorded in 2024. Grid-related bird mortality is being addressed by the ongoing LIFE “Safe Grid for Burgas” (2021–2026). According to the project manager, most NWRM remain operational and continue to deliver benefits to birds, with natural transformations and targeted upgrades.
Last update
2025
Summary
The project was implemented in 2009 by the Russenski Lom Nature Park Directorate, Club “Friends of Russenski Lom” and WWF, with the support of the Ministry of Culture, and was funded by WWF and the German Federal Ecological Foundation (DBU). Applying the principle “more space for the river – more safety for people”, it aimed to open sections of the dykes, allowing water to re-enter the floodplain, reducing road flooding risk, and restoring river–floodplain connectivity.
Since then, the intervention has been embedded in the park’s long-term management framework. In 2022, an updated 10-year Management Plan for the park was formally adopted, prepared under the Interreg V-A Romania–Bulgaria “GreenManagement” project. This plan integrates the earlier floodplain restoration into a wider strategy for Natura 2000 site conservation, hydromorphological monitoring, sustainable tourism, and cross-border cooperation. WWF has also reported complementary river restoration measures within the park, including barrier removals and the installation of a fish pass to improve longitudinal connectivity and support protected fish species. These actions consolidate the ecological and hydrological benefits initiated in 2009, now supported by structured governance, mapping tools, and systematic monitoring.
Last update
2025
Summary
Women in Europe for a Common Future (WECF) implemented Bulgaria’s first constructed wetland in Vidrare (Pravets) to treat domestic wastewater from the St. Panteleimon home while building local capacity. The plant is a vertical subsurface-flow reed bed for ~80 PE, combining an 18 m³ two-chamber settling tank with intermittent pumping to a 266 m² planted sand filter split into two beds; treated effluent discharges to a nearby gully. Design: Otterwasser (DE) and Ecoproject (BG); works: Interstroy; funding: German Federal Environment Foundation (DBU). Construction ran Oct 2010–Apr 2011; the facility was officially inaugurated on 29 April 2011. O&M is handled by trained staff from the home; reported investment was about €45,000 (+≈10% for planning). The site has served as a national demonstration/education example and continues to be cited by Bulgarian authorities (e.g., Ramsar COP14 National Report, 2022).
Last update
2025
Summary
Dimitrovgrad Municipality restored, protected and promoted the sustainable development of the “Zlato pole” protected area by securing additional water to maintain its hydrological regime and constructing a hydraulic intake and supply channel. Water is diverted from the Martinka River, via a small intake and settling basin, then conveyed ~580 m in a buried 600-mm pipe and ~520 m in an open canal with control gates; the scheme was completed in 2013. The 84.79-ha site overlaps the Natura 2000 SPA BG0002103 “Zlato pole”, for which the Ministry adopted site-specific conservation objectives in June 2024, including targets for key birds such as Pygmy Cormorant and Ferruginous Duck and for wetland habitats. Management is overseen by RIEW Haskovo, with an information centre in Raynovo supporting education and visitors. Post-project actions have included nest boxes, aquatic plantings (white waterlily) and safeguarding of Leucojum aestivum. Current pressures reported on site are recurrent fires, illegal hunting/fishing and occasional flooding along the Martinka. Overall, the restoration sustains wetland hydrology, enhances habitat mosaics on the Maritsa floodplain and underpins ongoing Natura 2000 commitments, while requiring continued local engagement and enforcement.
Last update
2025
Summary
LIFE-Nature “Green Borders” (LIFE07 NAT/RO/000681, 2009–2013), coordinated by WWF with Romanian and Bulgarian partners, aimed to secure Pygmy Cormorant (Phalacrocorax pygmaeus) and Ferruginous Duck (Aythya nyroca) by restoring nesting/feeding habitats and promoting best fisheries management. It created a cross-border framework for 11 Natura 2000 sites along the Lower Danube.
Key works included improving the hydrological regime of Kaikusha marsh in Persina Nature Park (BG), completed in 2012, and the ecological reconstruction of the Gerai(ului) backwater at the Olt–Danube confluence (RO) in 2011.
The project’s studies supported the 2013 designation of three Transboundary Ramsar complexes (Iezerul Călărași–Srebarna, Suhaia–Belene Islands Complex, and Bistret–Ibisha), strengthening coordinated wetland management across the border.
Follow-up restoration in the Lower Danube Green Corridor continued under the Living Danube Partnership: water control was modernised at Persina/Kalimok and a further project prepared for Kaikusha; in Romania, >400 ha at Gârla Mare–Vrata were reconnected to the Danube in 2022. Note: in Sept 2021, a major fire burned most reedbeds at Kaikusha, temporarily degrading habitat.
Last update
2025
Summary
The LIFE WETMAN project (2011–2015) restored six Slovenian wetlands (Pohorje bogs, Zelenci, Mura–Petišovci oxbows, Gornji kal, Planik and Vrhe). It improved hydrological conditions (e.g., dams on outflows in the Pohorje bogs and a gravel/sediment trap on the Čošelnov graben feeding Zelenci), removed overgrowth, and eliminated invasive fish in Gornji kal and the Mura oxbows. To reduce habitat damage and disturbance, footpaths/boardwalks were created in Zelenci and on the Pohorje bogs. Site-specific management guidelines were prepared and integrated into sectoral and Natura 2000 planning to ensure long-term conservation.
After LIFE, implementation continued: a Zelenci management plan was prepared in 2013 with the municipality; the national Natura 2000 Management Programme (2015–2020) and the integrated project LIFE-IP NATURA.SI (2018–2026) have supported further measures and monitoring. On Pohorje, follow-up regional projects (SUPORT and POHORKA, 2019–2023) consolidated habitat and visitor-management actions. WETMAN’s results were also recognised with a Best LIFE Nature award at EU Green Week.
Last update